Arbitration processes for the Rastatt Tunnel

Following the damage in the east tunnel of the Rastatt Tunnel, preparations to renovate have been underway since 2018. At the same time, the mediation proceedings agreed between DB Group and the Rastatt Tunnel consortium have been ongoing since 2017 to clarify the cause of the damage during tunnel boring and thus who is responsible. The procedure continues due to numerous potential causes of damage that are to be determined.